Category Archives: Latest Contracts
-
March 17, 2014
TOC subsidiary O’Connell Development Group welcomed beauty superstore Ulta to the Holyoke Crossing retail center. The 11,000-square-foot store, located next to Barnes & Noble, is the fast-growing retailer’s first in the area. The store has already hired more than 20 Read More
-
February 10, 2012
Center for the Advancement of Public Action Bennington College, Bennington, Vermont Daniel O’Connell’s Sons (DOC) managed construction of this three-building complex, designed by Tod Williams Billie Tsien Architects. Faced with Vermont marble, these buildings include state-of-the-art design and unique architectural Read More
-
January 27, 2012
Taunton Trial Court Taunton, Massachusetts Located in a densely-populated section of this urban city, construction of the new Taunton Trial Court required intensive collaboration between DOC, project team members, adjacent businesses, and the existing court, which was fully operational Read More
-
November 27, 2011
Gateway II Worcester Polytechnic Institute Worcester, Massachusetts DOC is currently the Construction Manager-at-Risk for Phase II of this 12-acre, mixed-use site for life sciences and biotech companies. Upon completion, Gateway Park will feature five life sciences buildings totaling 550,000 square Read More
-
October 27, 2011
Boston Harbor Clean-up Boston, Massachusetts In 1988, New England Fertilizer Company (NEFCO) was assigned one of the country’s largest-ever wastewater clean-up challenges: Boston Harbor. For more than 100 years, sewage sludge polluted the harbor, endangering wildlife and preventing recreational Read More